US$ 192.60
Hub mm 450 mm
Response time: > 80 ms
16 functions 15 time ranges (0
Siemens SITOP Modular
Blockheizkraftwerk mit elektrische Leistung Umformer Hub mm 450 mmCombined Heat and Power Plant Kuntschar & Schlter GTK50 (used, year of construction 2006) Former combined heat and power plant from a school, operated with natural gas. The CHP plant has an electrical output of 48 kW and a thermal output of 80 kW. Equipped with a reliable 4 cylinder gas Otto engine (engine type: MAN E 0834 E) and a Marelli generator (type: MJB 225 LA) with a rated voltage of 400V. Condition: Used, in good condition. Fuel: Natural gas
US$ 192.60
US$ 1365.00
US$ 714.00
US$ 749.70
US$ 149.85